by fuzzyduck on Tue Mar 11, 2008 8:35 pm
Tomorrow at 12:00 Title for Dorella passes from the current owner to me.
There are some Jobs to do on the boat, but none that I wasn't expecting. these are
1. change 1/4 inch to 3/8 inch gas pipe, and make sure it's all supported correctly. Also add a bubble tester. scrap old coolbox in cockpit.
2. The electrics are not good, she needs her system tidying up, and modernising, so all new circuit breakers, waterproof switches, and new cabling. as well as some small BSS jobs (like strapping the batteries down) Also some natty charging improvements, and a 240 volt system.
3. secure engine fuel hoses, and put chafe protection round water hoses etc.
4. Seal round exhaust pipe as it comes out just above the waterline. Can anyone say Milliput? Later I'm going to get a new exhaust made up, and route it a foot higher. (not sure how this will affect the installation of a bathing platfom, but that's a future job)
5. Renew exhaust brackets.
5. Some cosmetics to the hull GRP.
My CORGI dude, and My electrician are raring to get started, and it looks like an additional £500 - £700 will get her completely rewired (i'm paying the electrician in beer), and new gas piping run from stern to stem. As well as some quite tasty upgrades.